The lowest-cost cutting system is the one with the lowest total cost per part — tooling + machine time + tool changes + presetting — not the cheapest tool. Example: a $60 end mill that lasts 400 parts adds $0.15 per part in tooling; if it runs the part 2 minutes faster at a $90/hour shop rate, it saves $3.00 per part in machine time, 20 times its tooling cost. Put in your own numbers below.
Your numbers
Typical US rates — adjust anything below to your shop.
Defaults model a RobbJack tool at 4× the tool life and a faster cycle — conservative vs. our published case studies. Tune every field to your shop.
Your savings with RobbJack
That's 37% lower total cost and $53,906 over five years — on 5,000 parts a year.
Total annual cost
Where the savings come from
Cumulative savings
All-in cost per part
Includes tooling, machining time, tool changes, and presetting — not just the sticker price of the tool.
The numbers aren't hypothetical
Real shops, real parts, documented results. Every claim links to the proof.
Get this as a tailored report
We'll send your numbers to your local application engineer, who'll validate them on your actual part and recommend the exact tool. No obligation.
Estimates for illustration only, calculated from the figures you enter. Actual savings depend on your parts, materials, machines, and run conditions and are not guaranteed. Case-study results reflect specific customer applications; your results will vary.
Cost per part — common questions
Which cutting system has the lowest cost per part?
The one with the lowest TOTAL cost per part: tooling cost ÷ parts per tool, plus machine time × shop rate, plus the time lost to tool changes and presetting. Machine time is usually the largest term, so a tool that cuts faster or lasts longer often wins even when it costs more. The calculator on this page adds all four for your job.
How do you calculate machining cost per part?
Cost per part = (tool price ÷ parts per tool) + (cycle minutes × shop rate ÷ 60) + (tool-change and presetting minutes per tool × shop rate ÷ 60 ÷ parts per tool). Example: $60 tool, 400 parts, 6-minute cycle, $90/hour, 10 minutes per tool change: $0.15 + $9.00 + $0.04 = $9.19 per part.
This calculator models the four cost centers from RobbJack's original Cost Evaluation Worksheet. Results are estimates based on the numbers you enter; your local application engineer will validate them on your actual part. Case-study figures are documented results from specific applications and will vary by job.
Prefer a spreadsheet? Download the classic machining cost calculation Excel worksheet (free, no signup) and run the same numbers offline.